Construction is never on schedule, but it seems we have finally turned the corner. The foundation, the electrical, the plumbing and the heat and air. It is finally moving along. A few pictures here, none of the bathrooms because there was not enough light.

 Another window (top right) has been installed to add symmetry to the front.
In living room, looking into the kitchen. To the left a hint of the bathroom door and behind the wall are the stairs.

Laundry room.
In kitchen looking into the living area.

Front bedroom upstairs (new window to the right).

Another bedroom.

Bedroom 3.

Hallways with entries to bedrooms 3 and 4.

Stairs
Mark poured a double driveway in the back and added a carport.
Besides the street in front of the house, there is an alleyway that goes behind the property which accesses the carport.